top of page

Tailor-made 78" pipe for Central Oregon Highway Extension project

  • May 9
  • 1 min read

This Highway Extension project in Central Oregon has been underway for years. Krah USA is grateful to have been included in both Phase 1 and Phase 2 of this project. We manufactured a 78" diameter HDPE pipe that has been placed underneath the highway. The main canal pipe will pass through our HDPE, carrying raw water across.




 
 
 
bottom of page